Insights
On tolerances, setups and material prices, plus news about Blake and Subduxion.
Featured
On 18 and 19 November Blake is at the Precision Fair in 's-Hertogenbosch, stand H1-101. We show what AI does in a machine shop.
Category: News
For the cost engineer
Category: Guides
For the manufacturing engineer
Category: Know-how
For owners and management
Category: Research
Shop-floor craft as it happens: one situation per article, the choices you have and what each one costs.
What AI changes in a machine shop's office, from drawing to quote, and why the price stays with the estimating team.
A cost price in the order you build it: rate, material, blank, setups, batch size, finishing, actuals and the tool you estimate in.
35 results
A buyer puts a should-cost model next to your quote. Here is how to find, line by line, where the model and your shop part ways.
A part with round and flat features can come from bar or from a block. Here is how to choose the route and find the quantity at which it tips.
AI earns its place in the estimating office, where every request needs a cost price, as a proposal your cost engineer confirms or corrects.
The material line costs what your supplier charges for this block, with source and price date.
On 18 and 19 November Blake is at the Precision Fair in 's-Hertogenbosch, stand H1-101. We show what AI does in a machine shop.
Geometry, material, tolerance, finish, quantity and lead time side by side.
Every tolerance, roughness value, material choice and feature position lands in a cost line of its own: machining, setup, inspection or subcontracting.
The program and fixture are paid for, the first article inspection in part. What drops out of a repeat order, what gets shorter and what must be redone?
A thin wall adds no material, but it costs passes, setups and scrap. How to cost each measure as a separate line, with the reason beside it.
A lower Ra costs money only on the face that carries it. Choose the route per face, ask if sizes apply before or after coating, and cost the finish separately.
A tolerance only costs money when it calls for an extra operation, another gauge or another machine. How to find those dimensions on a drawing and cost them.
Which aluminium alloy and which stock form suit a milled or turned part, and what does that choice do to distortion, anodising and the price per part?
Plastic machines fast but costs money in different places from metal: in the block, in stress and size, and in scrap. How to build the price up line by line.
A turned part with a spanner flat and a cross hole can travel across two machines or come off one finished. How to check, part by part, which route costs less.
Ten parts cost more each because setup and programming happen once per batch, and that fixed time belongs on its own line in the estimate.
A machine hour rate belongs to one machine, with the operator beside it as a rate of its own.
Every setup adds setup time, programming time and one more clamping of every part, so count them by machining direction before the quantity breaks are fixed.
Record a part once, at the request, and build every later step on that record.
Test estimating software on a drawing you have already quoted, priced with your own machines and rates, in lines you can check.
An AI estimate proves itself line by line, not with an accuracy figure on the total.
Most of the hours in a CNC quote go on retyping and looking things up, and that is where software should make the first proposal.
Every cycle time should say where it came from: estimated, from CAM, simulated or measured.
Why AI pilots in manufacturing stall, and what it takes to make one pay off in estimating and work preparation.
A customer drawing falls under your NDA, and the NDA decides what may happen to it in an AI tool.
What an experienced cost engineer knows does not survive an exit interview, a handbook of rules of thumb or a spreadsheet nobody else can read.
A request is complete only when every part has its model, a drawing with its revision, and the requirements the model does not hold.
A price can be defended only when a colleague can check every estimate line, with its time, rate and quantity beside it.
A requirement read from a drawing should only count in the cost price once the cost engineer has confirmed it.
A 6082 housing, 25 pieces, black anodised, and the anodiser's price has not come back yet. That line belongs visibly open.
A position tolerance of Ø0.02 mm is a route decision: it settles setup, machine and measuring, and with them the price of one feature.
A 6082 housing with two bores in one position tolerance is planned back to front: the last setup first, then back to raw stock.
Material is costed on the sawn piece, not on the model's bounding box.
Job costing on the order total adjusts the wrong standards: an 11 per cent overrun hides a milling operation that ran nearly half over.
ISO 2768-mK in the title block covers every dimension without its own tolerance, and what it costs is mostly inspection time, not extra axes.
The AI Innovation Center at High Tech Campus Eindhoven welcomes Subduxion, the company behind Blake, as a resident.
Source: AI Innovation Center
In a demo we take one part from drawing to cost with you.