Sheet and machined parts in one request.

Every part with model, drawing and quantity. The milled and turned parts are estimated in the same request.

A fabrication taken apart.

Requests / Part
Request
  • SDX-PLT-020_Rev-B.pdf
  • SDX-PLT-020_Rev-B.step
Quantities
520
Revision
B
SDX-PLT-020 Rev BCover

Requirements on the drawingTo check

Material
1.4301, 2 mm
Finishing
Brushed K240
General tolerance
ISO 2768-m
Bend radius
R2 inside
Example

Every part of a fabrication with model, drawing, quantity and revision, in one request.

  • One line per part

    Sheet parts and machined parts side by side in the same request.

  • Requirements as proposals

    Material, tolerance and finishing: confirm them or change them.

  • Paired per part

    STEP and PDF are matched by file name. If a match is uncertain, you make the call.

Factory / Materials
  • ECBExchange ratesEvery working day
  • EurostatProducer pricesMonthly
  • World BankAluminium, LMEUSD 3,283/tSep 2026

Your material catalogueYour own names and prices

Own purchasingEN AW-6061block€6.40per kgSource: own purchasingAs of 1 Oct 2026
Reference onlyWorld Bank, Pink SheetAluminium, LME primaryUSD 3,283/tSep 2026Monthly average

Reference updatedAluminium, Sep 2026. The estimate still uses your own purchase price.

Example estimate

Your own material names and purchase prices in one place, metals and plastics.

  • Your purchase prices

    Per material, with unit and date.

  • Names you recognise

    One catalogue with the material names your shop uses.

  • References apart

    ECB, Eurostat and World Bank as a trend, with source and date. Never a purchase price.

Same request / Bearing block SDX-MFG-031
EstimateDraft

SDX-MFG-031 Rev B, 25 parts

Material
EN AW-6082, 84 × 64 × 44 mm
General tolerance
ISO 2768-mK
Roughness
Ra 3.2 general
FinishingOutsourced
Clear anodising
Setups
2, 3-axis
Cycle time
18 min × €85.00/h
ProgrammingOne-off
1.5 h × €95.00/h
SetupPer series
1 h × €85.00/h
Cost per part

What does this part cost in your shop?

See how Blake calculates with your machines, rates and production setup.

Request a demo
Blake works it out on your machines and rates.
Example estimate

The milled and turned parts in your fabrication, with material, machining, finishing and setup as their own lines.

  • Every line with its inputs

    Time, rate and quantity sit right beside it.

  • Outsourced work included

    Powder coating as its own line, at your coater’s price.

  • The quantity asked

    The cost for the quantity the customer asks for.

What makes sheet work cheap or dear.

  1. The sheet and the nest.

    How many flat patterns fit on a sheet decides what the material costs per part.

  2. Cut length and bends.

    The length of the cut line, the number of pierces and every bend with its changeover all take time.

  3. A hole near a bend line.

    A hole too close to a bend line tears, and it often only shows at the press brake.

One model under estimating and the shop floor.

Underneath Blake sits Subduxion’s manufacturing world model: how a part, its requirements, your machines and your team’s decisions fit together. The next steps build on it.

  • Tools, holders and fixtures go into the same model.
  • Next: every setup checked before the machine runs.
  • Engineering, estimating and production then work from one model.

Frequently asked questions

Can I put sheet parts and machined parts in one request?

Yes. Every part gets its own line with model, drawing, quantity and revision, and you estimate the milled and turned parts in the same request. Next: cutting, bending and welding as cost models of their own.

How do outsourced steps count?

As their own line in the cost, at the price in your own supplier list. If a price is missing, the line stays open until you fill it in.

Which files can I use?

STEP models and PDF drawings, paired per part.

See a fabrication in Blake.

In the demo we show how a request with sheet parts and machined parts comes into Blake.

SDX-MFG-001 Rev J