GlossaryKind of term: Standard and conventionFit (H7/g6)

What is a fit between hole and shaft?

A fit pairs a tolerance class on a hole with one on a shaft, such as H7/g6, and so settles whether the parts assemble with clearance or interference.

A fit is the relationship between two mating parts, usually a shaft in a hole, set by a tolerance class on each. In the ISO system a capital letter stands for the hole and a lower-case letter for the shaft; the letter gives the position of the tolerance zone relative to the nominal size, the number gives the IT grade and so the width. At ⌀20 H7/g6 the hole lies between 20.000 and 20.021 mm and the shaft between 19.980 and 19.993 mm, which leaves a clearance of 0.007 to 0.041 mm. There are three types: a clearance fit, with clearance at every permitted size; a transition fit, such as H7/k6, which can end up with clearance or interference; and an interference fit, such as H7/s6, with interference at every permitted size.

What does a fit depend on?

Which fit a designer chooses depends on the function: rotating or sliding, accurate location, or carrying load without a key; length of engagement, materials, operating temperature and assembly method count as well. Many drawings use the hole-basis system, with an H hole and the fit chosen through the shaft, because holes are made and checked with fixed-size tools such as reamers and plug gauges. The shaft-basis system, with an h shaft, suits drawn bar used without further machining, or one shaft that carries several parts with different fits.

What does the standard say about a fit?

Codes and limit deviations are set in ISO 286-1, the basis of tolerances, deviations and fits, and ISO 286-2, the tables per tolerance class; the current edition of both is from 2010. The values hold at the reference temperature of 20 °C. Under the independency principle of ISO 8015, a size tolerance limits only the local sizes, by default the two-point size of ISO 14405-1, not the form as a whole: a shaft can be within size at every point and still be bent or lobed. Where function demands it, the drawing often adds the envelope requirement, as in ⌀20 H7 Ⓔ, or a separate form tolerance. Older German drawings under DIN 7167 apply the envelope requirement without any indication; which rule holds follows from the standard the drawing refers to.

How does a fit work in practice?

A fit shapes the route. A hole at IT7 is often pre-drilled and then reamed, bored or circular-milled to size; a shaft at IT6 often needs a fine finishing cut or cylindrical grinding. What a single pass can hold depends on machine, tooling, size, material and temperature. Measuring often becomes a step of its own too, with a plug gauge or a bore micrometer. Whether fits add time and cost depends on how many there are, the operations already in the route, how often you measure and the batch size.

What is a fit often confused with?

A fit is not an IT grade: the grade only gives the width of one tolerance zone, while the fit pairs two zones with their positions. A tolerance class such as H7 is not yet a fit either; only with the mating part's class is it settled whether there is clearance or interference. And a fit is not a form requirement: without Ⓔ or a form tolerance, size alone does not limit straightness and limits roundness only in part.

How do you see a fit in Blake?

In Blake, fits and other tolerances sit with the part as proposals from the drawing, together with material, roughness, finishing and threads. You confirm or correct them; who did so and when stays visible, with a note if you add one. The Machine fit in Blake is a different thing: a first check per machine on envelope and axes, naming the deciding limit. More on requests.

Frequently asked questions

What does H7/g6 mean on a drawing?

A clearance fit under ISO 286: H7 on the hole, g6 on the shaft. At ⌀20 the clearance is 0.007 to 0.041 mm: a close sliding fit for guiding or locating. For free running a looser class such as f7 is more usual.

When do you choose a clearance, transition or interference fit?

It follows from the function. Clearance when the part has to rotate, slide or assemble easily; transition to locate accurately with light assembly force; interference when the joint itself has to carry the load. Length, materials and temperature help decide which class suits.

How do you measure an H7 hole?

With a go/no-go plug gauge when you want quick checks in a batch, or a bore micrometer or three-point gauge when you need the actual size. The measurement uncertainty has to be small against the tolerance, which at ⌀20 H7 is 21 µm.

Your shop's terms. In every estimate.

Blake lays out the requirements from drawing and model as proposals and builds the cost per operation, with your own machines and rates. Your team decides.